Eastbound Nanakuli Contraflow Drivers: Update 

  
Some good news for eastbound drivers…the eastbound contraflow lane closure is temporary and will most likely end in late 2017. By that time, a 1.2 mile continuous 5th lane should be complete in Nanakuli, which will serve as a turning lane in the morning. The hope is to secure funding to turn the 5th lane into a contraflow lane in the afternoon. This will hopefully help to alleviate both eastbound and westbound traffic during peak hours.
Furthermore, DOT is conducting a study of the feasibility of extending the 5th lane to Hakimo Road:

https://21maile.com/2016/09/12/nanakuli-5th-lane-study-being-conducted-by-dot/
#hidot #farringtonhighway #nānākuli #maileshimabukuro

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: